2009.09.07 20,000 t Crushed Ore Stockpile
2009.09.07 20,000 t Crushed Ore Stockpile
2009.09.07 Upgraded Crushing Circuit
2009.09.07 Upgraded Crushing Circuit
2009.08.28 Floor control with laser level
2009.08.28 Floor control with laser level
2009.08.28 Mining Operations
2009.08.28 Mining Operations
2009.08.28 New Kraneks Excavator
2009.08.28 New Kraneks Excavator
2009.08.18 Tailings Storage Facility 2 construction
2009.08.18 Tailings Storage Facility 2 construction
2009.09.07 Welding plastic lining
2009.09.07 Welding plastic lining
2009.09.10 Final construction
2009.09.10 Final construction