• Home
  • |
  • About Us
    • Company
    • Management
  • |
  • Operations
    • Sekisovskoye
    • Ognevka
    • Gallery
  • |
  • Kazakhstan
  • |
  • Investor Relations
    • Reports
    • Archive
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
    • AIM Rule 26
    • Links
  • |
  • Contact Us
  • |

Gallery

Underground Development Planning


East West Isometric View
East West Isometric View
East West Isometric View
North West View showing Underground
North West View showing Underground
North West View showing Underground
Sekisovka Open Pit
Sekisovka Open Pit
Sekisovka Open Pit
South North Elevation View
South North Elevation View
South North Elevation View
Surface Portal Location
Surface Portal Location
Surface Portal Location
View from South showing Final Pit
View from South showing Final Pit
View from South showing Final Pit

 

Crushing Operations


2009.09.07 20,000 t Crushed Ore Stockpile
2009.09.07 20,000 t Crushed Ore Stockpile
2009.09.07 20,000 t Crushed Ore Stockpile
2009.09.07 Upgraded Crushing Circuit
2009.09.07 Upgraded Crushing Circuit
2009.09.07 Upgraded Crushing Circuit

 

Mining Operations


2009.08.28 Floor control with laser level
2009.08.28 Floor control with laser level
2009.08.28 Floor control with laser level
2009.08.28 Mining Operations
2009.08.28 Mining Operations
2009.08.28 Mining Operations
2009.08.28 New Kraneks Excavator
2009.08.28 New Kraneks Excavator
2009.08.28 New Kraneks Excavator
2009.09.10 Excavation activities
2009.09.10 Excavation activities
2009.09.10 Excavation activities

 

Site Infrastructure


Plant Entrance
Plant Entrance
Plant Entrance
Plant change room
Plant change room
Plant change room
Machine shop
Machine shop
Machine shop
Reagent store
Reagent store
Reagent store
Boiler house
Boiler house
Boiler house

 

Electrical Installations


Main substation switchgear
Main substation switchgear
Main substation switchgear
Commissioned 14MW substation
Commissioned 14MW substation
Commissioned 14MW substation

 

Plant Operations


Primary and Secondary mills
Primary and Secondary mills
Primary and Secondary mills
Leach tanks 2, 4 & 6
Leach tanks 2, 4 & 6
Leach tanks 2, 4 & 6
First pour
First pour
First pour
Stiring the pot
Stiring the pot
Stiring the pot
Leaching circuit
Leaching circuit
Leaching circuit

 

Tailings Dam Construction


2009.08.18 Tailings Storage Facility 2 construction
2009.08.18 Tailings Storage Facility 2 construction
2009.08.18 Tailings Storage Facility 2 construction
2009.09.07 Welding plastic lining
2009.09.07 Welding plastic lining
2009.09.07 Welding plastic lining
2009.09.10 Final construction
2009.09.10 Final construction
2009.09.10 Final construction

Operations

Sekisovskoye
Ognevka
Gallery
Sekisovskoye:
Disclaimer | Sitemap | © 2010 Hambledon Mining Plc.